16.05.2018 OLO, A.S., WASTE INCINERATION PLANT, BRATISLAVA – REPAIR OF +120/2.39m CHIMNEY BODY

At present, a repair of the chimney body of the +120/2.39m chimney of OLO, a.s., waste incineration plant, Bratislava, is being carried out.

20.04.2018 CRH (SLOVAKIA), A.S., ROHOŽNÍK – COMPREHENSIVE RENOVATION OF +90/2.2 M CONCRETE CHIMNEY OF A WHITE-CEMENT ROTARY KILN, BUILT OF Z-SHAPED BLOCKS

On 20 April 2018, a comprehensive renovation of the concrete chimney of a white-cement rotating kiln made of Z-shaped blocks (+90 / 2.2 m) of CRH (Slovakia), a.s., Rohožník, was successfully completed.

20.12.2017 KNAUF Insulation s.r.o, Nová Baňa – Stage 2 of the reconstruction of reinforced-concrete +130 m chimney

On 20 December 2017, we successfully handed over the second stage of the reconstruction of the monolithic reinforced-concrete three-component +130/5.7m chimney of KNAUF Insulation s.r.o, Nová Baňa, within the agreed deadline.

24.10.2017 Tepláreň Košice, a.s., Košice – TEKO I +98.80 m Chimney Structural Repair

At present, the next stage of the repair of the reinforced-concrete multi-component +99.80 / 4.50 m TEKO I chimney made of building blocks is being carried out. The repair started in the second half of 2016 and its completion is scheduled to May 2018.